From the design of the Sioux Falls City Hall facility in the 1930’s to recent National Guard and Department of Transportation work in multiple
states, TSP has had a focus on Civic, Military, and Government clients. The expertise and experience gained from working on contracts such as these allows us to provide best-value solutions to solve facility needs. Because of our experience in working with government clients, we are able to help our clients consider and address any special needs, future usage, and security requirements they may not otherwise have addressed. We are well-versed in complying with individual agency requirements and standards.
Rochester Area Family Y
McGovern Public Library
Lake City Marina
Palisades Subdivision
Chapel Lane Bridge Widening
Rochester Area Family Y
Rochester, Minnesota
18,000 SF Facility Expansion and Remodel
- Fitness Center Expansion
- New Family Recreation Pool
- Water Slide
In addition to the two areas of expansion, extensive renovation of the interior of the facility was designed to improve circulation and membership interface and control at the main entrance, locate all child care services near the main entrance on the main level, improve stair circulation to other levels, and improve the locker room facilities.
McGovern Public Library
Mitchell, South Dakota
New 45,000 SF Library, Media Center, and Community Center
- Collection, archives, and study space
- Reflects the existing campus aesthetic and material palette
Lake City MarinaAdministration Building
Lake City, Minnesota
Originally constructed in 1965 – with a substantial addition in 1984 – the Lake City Marina houses over 1,000 boats
and includes:
The new facility houses all activities above the established flood protection elevation, and the structure and materials have been designed to meet the requirements of FEMA for "Wet Floodproofing".
Palisades Subdivision
Spearfish, SD
71 Lot Subdivision Located in Wooded Foothills
Close coordination with the City and the Department of Environment and Natural Resources to obtain the required approval.
Divided into four construction phases, which include complete design of all utilities including water, sanitary sewer, power, communications, and gas.
Chapel Lane Bridge Widening
Rapid City, South Dakota
Widened bridge from 2 lanes to 3 lanes
-alleviated intersection bottle neck at the bridge
-extended abutments and the main span superstructure built around the sewer main
-construction performed while maintaining two lanes of traffic on the existing bridge deck
- improved access for homes, businesses, and emergency vehicles